The drive is roughly 280 km (5–6) via NH48. Real EV range depends on speed, AC use, and elevation.
Most drivers with 300–450 km rated cars plan one or two DC fast-charging stops unless starting near full.
Plan now uses a vehicle preset, 90% start SOC, Wh/km from preset, and cost-aware ranking on longer corridors. Adjust on the planner page if needed.
Ranked by typical charging stops on ~280 km via NH48. Open a model page or plan with that preset in one tap.
Top pick
Hyundai Creta Electric
~390 km range · Often no DC stop
At ~280 km, this leg is within a full charge for a Hyundai Creta Electric (~390 km ARAI) when you start at 90% SOC and keep a 20% reserve.
Jump to chargers, overnight hotels, meal stops, or pick your EV model — each page links back here and opens the trip planner pre-filled for Delhi → Jaipur.
Popular searches for Delhi → Jaipur — each page answers yes/no, typical charging stops, and opens the planner.
Long-tail guides for NH48 — operators, state hubs, and NH-specific EV charging notes linked to this route.
Start Delhi at 90% SOC. For ~280 km via NH48, EV Grids typically places primary DC stops near Neemrana or Shahjahanpur for shorter-range EVs. Pick a backup at each halt before merging back onto the highway.
Illustrative only — open Plan now above for ranked stops with your vehicle preset and live charger data.
The drive is roughly 280 km (5–6) via NH48. Real EV range depends on speed, AC use, and elevation.
Most drivers with 300–450 km rated cars plan one or two DC fast-charging stops unless starting near full.
Enter Delhi and Jaipur, pick your vehicle preset, and get ranked chargers with backup options at each stop.
Open the full route in Google Maps, copy an itinerary, or share a link with travel companions.
The Delhi to Jaipur leg (~280 km) is a heavily searched EV route in India. Stops should sit on or within a few kilometres of your driving polyline — not city-centre chargers that add long detours.
Mid-route break areas near Neemrana or Shahjahanpur for shorter-range EVs tend to combine food, restrooms, and DC hardware. Open Plan now with your vehicle preset for ranked primary and backup options.
Operators along this corridor include Rajasthan highway plazas. Session pricing changes by state and operator — set a max ₹/kWh cap if you want to skip expensive sites.
Availability is not guaranteed. Use reliability badges in the planner and always keep a secondary charger selected.
Summer: AC load can exceed 20% extra consumption on highway speeds — enable adjust for conditions. Monsoon: add buffer time for reduced speeds and detours.
Weekend queues at single-gun plaza stations are common — prefer multi-gun hubs when the map shows them.