Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~340 km · NH48 · 5–6 typical drive
May — pre-monsoon heat advisory
May and June heat across India often adds 10–15% energy use on highways (AC, battery cooling). Bump reserve SOC and search threshold for this route.
- AC load and hot battery packs reduce real range — add 5% reserve SOC in May–June.
- Plan DC stops earlier than winter; verify live charger status before you leave each city.
Suggested planner settings: 25% reserve SOC · 35% search threshold
Chargers along this route
25 cached stations along ~333.1 km (fresh route). Sorted by distance from Jaipur.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 1 | Statiq Charging Station★ 4.3 (7) | 60 | CCS2 | ~₹22 |
| 1 | Xobolt Charging Station★ 4.9 (23) | 60 | CCS2 | ~₹26 |
| 1 | Xobolt Charging Station★ 3.8 (26) | 50 | CCS2 | ~₹26 |
| 1 | Adani Charging Station★ 3.0 (4) | 30 | CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 1 | Tata Power Charging Station★ 4.0 (14) | 30 | Ev Connector Type Other, CCS2, CHAdeMO | ~₹18 |
| 3 | Statiq Charging Station★ 2.0 (4) | 60 | Type 2, Ev Connector Type Other, CCS2 | ~₹22 |
| 4 | Statiq Charging Station★ 4.1 (9) | 60 | Ev Connector Type Other, CCS2 | ~₹22 |
| 4 | Tata Power Charing Station★ 3.6 (10) | 25 | CCS2 | ~₹18 |
| 5 | Adani Charging Station★ 3.2 (6) | 160 | CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 6 | Statiq Charging Station★ 2.0 (4) | 60 | CCS2, Ev Connector Type Other | ~₹22 |
| 7 | Tata Power Charging Station★ 4.9 (20) | 60 | CCS2, Type 2 | ~₹18 |
| 8 | Xobolt Charging Station★ 4.4 (60) | 120 | CCS2, Ev Connector Type Other, Type 2 | ~₹26 |
| 9 | Electric Vehicle Charging Station★ 4.7 (25) | 30 | CCS2 | ~₹26 |
| 77 | Adani Charging Station★ 3.0 (4) | 60 | CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 82 | Tata Power Charging Station★ 2.3 (3) | 60 | CCS2 | ~₹18 |
| 83 | BPCL Charging Station★ 1.7 (3) | 30 | CCS2 | ~₹26 |
| 86 | ECOPLUG Charging Station★ 2.3 (6) | 60 | CCS2 | ~₹26 |
| 88 | BPCL Charging Station★ 3.5 (4) | 30 | CCS2 | ~₹26 |
| 95 | Statiq Charging Station★ 2.3 (3) | 120 | CCS2 | ~₹22 |
| 96 | Xobolt Charging Station★ 4.3 (14) | 60 | CCS2 | ~₹26 |
| 96 | Tata Power Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹18 |
| 100 | Tata Power Charging Station★ 5.0 (2) | 60 | CCS2 | ~₹18 |
| 103 | BPCL Charging Station★ 5.0 (2) | 60 | CCS2 | ~₹26 |
| 108 | Xobolt Charging Station★ 3.5 (2) | 60 | CCS2 | ~₹26 |
| 116 | Tata Power Charging Station★ 4.7 (3) | 60 | Type 2, CCS2 | ~₹18 |
Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Jaipur → Jodhpur
Best EV for this corridor
Ranked by typical charging stops on ~340 km via NH48. Open a model page or plan with that preset in one tap.
Top pick
Mahindra XUV400
~456 km range · Often no DC stop
At ~340 km, this leg is within a full charge for a Mahindra XUV400 (~456 km ARAI) when you start at 90% SOC and keep a 20% reserve.
More on this route: hotels · restaurants · all corridors