Ahmedabad → Jaipur

EV chargers on Ahmedabad → Jaipur

Plan Ahmedabad → Jaipur with ranked DC fast chargers along NH48. EV Grids picks primary and backup stops for your vehicle range — typically 1 dc fast-charging stop on this ~650 km leg.

Fast chargers on this corridor

  • Primary + backup charger at every stop — swap on the map if a site is busy or offline.
  • Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
  • Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.

~650 km · NH48 · 10–11 typical drive

May — pre-monsoon heat advisory

May and June heat across India often adds 10–15% energy use on highways (AC, battery cooling). Bump reserve SOC and search threshold for this route.

  • AC load and hot battery packs reduce real range — add 5% reserve SOC in May–June.
  • Plan DC stops earlier than winter; verify live charger status before you leave each city.

Suggested planner settings: 25% reserve SOC · 35% search threshold · hills & weather on (includes monsoon adjustment Jun–Sep)

Chargers along this route

48 cached stations along ~642 km (fresh route). Sorted by distance from Ahmedabad.

Plan ranked stops
kmStationkWConnectors₹/kWh
3Torrent Power Charging Station3.7 (12)60CCS2~₹26
3Torrent Power Charging Station4.3 (25)60CCS2~₹26
3Ola Charging station2.0 (27)30CCS2~₹26
6MobiLane Charging Station4.4 (34)80Ev Connector Type Other, CCS2~₹26
9MobiLane Charging Station3.6 (8)30Ev Connector Type Unspecified Wall Outlet, Ev Connector Type Other, Ev Connector Type Unspecified Gb T~₹26
13Mobilane Charging Station4.5 (2)80CCS2, Ev Connector Type Unspecified Wall Outlet, Ev Connector Type Other~₹26
20ChargePod Charging Station5.0 (1)30CCS2~₹26
20Chargepod Charging Station4.6 (9)50CCS2~₹26
21Adani Charging Station2.8 (4)30Ev Connector Type Unspecified Wall Outlet, CCS2, Type 2~₹26
22MobiLane Charging Station4.3 (39)80Ev Connector Type Other, CCS2, Ev Connector Type Unspecified Wall Outlet~₹26
26Statiq Charging Station4.5 (11)60Ev Connector Type Other, CCS2~₹22
26Tata Power Charging Station4.3 (7)25CCS2~₹18
26Electric Vehicle Charging Station3.0 (2)60Ev Connector Type Unspecified Wall Outlet, CCS2~₹26
27Statiq Charging Station1.0 (3)60Type 2, CCS2, Ev Connector Type Other~₹22
28Necellemobility Charging Station3.5 (6)60CCS2, Ev Connector Type Other~₹26
29Kazam Charging Station3Ev Connector Type Unspecified Wall Outlet~₹26
76Tata Power Charging Station4.6 (24)30CCS2~₹18
90Adani Charging Station1.5 (8)60Ev Connector Type Unspecified Wall Outlet, CCS2~₹26
116YoCharge Charging Station2.0 (5)35CCS2~₹26
116MobiLane Charging Station4.5 (27)80CCS2~₹26
126Tata Power Charging Station3.8 (4)30CCS2~₹18
128Kazam Charging Station5.0 (3)30CCS2~₹26
136BPCL Charging Station5.0 (1)60CCS2~₹26
144Tata Power Charging Station5.0 (1)30CCS2~₹18
147E-DRIVE Charging Station4.8 (4)30CCS2~₹26
148BPCL Charging Station4.3 (3)30CCS2~₹26
151GLIDA Charging Station60CCS2~₹24
154GLIDA Charging Station4.0 (1)60CCS2~₹24
162ChargeZone Charging Station4.2 (5)60CCS2~₹21
175Adani Charging Station4.0 (4)60CCS2, Ev Connector Type Unspecified Wall Outlet~₹26
175BPCL Charging Station5.0 (1)30CCS2~₹26
175Adani Charging Station30CCS2, Ev Connector Type Unspecified Wall Outlet~₹26
175HPCL Charging Station3.6 (11)30CCS2~₹26
175EV Urjaa Charging Station3.0 (2)8Ev Connector Type Unspecified Wall Outlet, Type 2~₹26
175BPCL Charging Station60CCS2~₹26
175Electric vehicle charging station4.4 (5)60CCS2~₹26
175Tata Power Charging Station30CCS2~₹18
175Tata Power Charging Station4.3 (4)90CCS2~₹18
175Tata Power Charging Station5.0 (1)25CCS2~₹18
175BPCL Charging Station60CCS2~₹26
175BPCL Charging Station60CCS2~₹26
175BPCL Charging Station60CCS2~₹26
175BPCL Charging Station60CCS2~₹26
175EV Urjaa Charging Station5.0 (16)8Type 2, Ev Connector Type Other~₹26
181Electric Vehicle Charging Station5.0 (1)60Ev Connector Type Unspecified Wall Outlet, CCS2~₹26
187E-Drive Charging Station4.8 (4)30CCS2~₹26
188BPCL Charging Station3.7 (3)30CCS2~₹26
188ChargeZone Charging Station3.2 (5)60CCS2~₹21

Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.

Want primary + backup picks at each stop? Plan AhmedabadJaipur

Best EV for this corridor

Ranked by typical charging stops on ~650 km via NH48. Open a model page or plan with that preset in one tap.

Top pick

Tata Curvv EV (45 kWh)

~430 km range · Typically 1 DC stop

Doable

The ~650 km drive is longer than one comfortable leg in a Tata Curvv EV (45 kWh). Most drivers plan one DC session on NH48, starting around 80–90% SOC.

More on this route: hotels · restaurants · all corridors