Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~560 km · NH65 · 9–10 typical drive
Chargers along this route
48 cached stations along ~523 km (route cache). Sorted by distance from Pune.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 3 | Nikol EV Charging Station★ 4.6 (39) | 60 | CCS2 | ~₹26 |
| 3 | Powerbank Charging Station★ 4.0 (5) | 30 | CCS2 | ~₹26 |
| 3 | Shell Recharge Charging Station★ 3.8 (13) | 120 | CCS2 | ~₹0.52 |
| 10 | BPCL Charging Station★ 3.0 (2) | 30 | CCS2 | ~₹26 |
| 14 | Bijlify Charging Station★ 3.0 (6) | 60 | CCS2 | ~₹26 |
| 16 | ChargeZone Charging Station★ 4.2 (83) | 60 | CCS2 | ~₹21 |
| 16 | Electric Vehicle Charging Station★ 4.6 (13) | 150 | CCS2 | ~₹26 |
| 16 | ChargeZone x TATA.ev MegaCharger★ 4.7 (12) | 120 | CCS2 | ~₹21 |
| 16 | Electric Vehicle Charging Station★ 2.8 (8) | 30 | CCS2 | ~₹26 |
| 17 | TATA Charging Station★ 3.3 (20) | — | CCS2 | ~₹26 |
| 18 | E-Fill Charging Station★ 4.6 (21) | 60 | CCS2 | ~₹26 |
| 42 | Nikol EV Charging Station★ 3.7 (3) | 25 | CCS2 | ~₹26 |
| 45 | HPCL Charging Station★ 4.5 (2) | 30 | CCS2 | ~₹26 |
| 52 | Jio-bp pulse Charging Station★ 3.2 (5) | 60 | CCS2 | ~₹25 |
| 54 | BPCL Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹26 |
| 68 | Zeon★ 4.9 (79) | 60 | Type 2, CCS2 | ~₹20 |
| 74 | BPCL Charging Station★ 4.7 (3) | 30 | CCS2 | ~₹26 |
| 74 | Tata Power Charging Station★ 3.7 (3) | 60 | CCS2 | ~₹18 |
| 76 | BPCL Charging Station★ 1.5 (2) | 30 | CCS2 | ~₹26 |
| 86 | Electric Vehicle Charging Station★ 5.0 (2) | 180 | CCS2 | ~₹26 |
| 88 | BPCL Charging Station★ 5.0 (8) | 60 | CCS2 | ~₹26 |
| 98 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 99 | eDrive Charging Station★ 2.5 (4) | 30 | CCS2 | ~₹26 |
| 105 | HPCL Charging Station★ 2.8 (4) | 30 | CCS2 | ~₹26 |
| 106 | Electric Vehicle Charging Station★ 5.0 (3) | 60 | CCS2 | ~₹26 |
| 107 | Statiq Charging Station★ 3.0 (5) | 60 | CCS2 | ~₹22 |
| 138 | BPCL Charging Station★ 3.0 (2) | 30 | CCS2 | ~₹26 |
| 152 | E-Fill Eletric Charging Station★ 4.3 (8) | 60 | CCS2 | ~₹26 |
| 162 | Nikol EV Charging Station★ 5.0 (123) | 30 | CCS2 | ~₹26 |
| 164 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 164 | Electric Vehicle Charging Station★ 5.0 (5) | 30 | CCS2 | ~₹26 |
| 164 | BPCL Charging Station★ 5.0 (1) | 60 | CCS2 | ~₹26 |
| 165 | BPCL Charging Station★ 4.3 (9) | 30 | CCS2 | ~₹26 |
| 167 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 170 | Electric Vehicle Charging Station★ 5.0 (5) | 60 | CCS2 | ~₹26 |
| 175 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 181 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 181 | BPCL Charging Station★ 5.0 (1) | 60 | CCS2 | ~₹26 |
| 183 | ChargeZone Charging Station★ 2.5 (2) | 120 | CCS2, Type 2 | ~₹21 |
| 188 | Zeon Charging Station★ 3.6 (7) | 30 | CCS2 | ~₹20 |
| 191 | BPCL Charging Station★ 3.5 (8) | 30 | CCS2 | ~₹26 |
| 191 | Vraj Technologies Charging Station★ 3.8 (30) | 30 | CCS2, Type 2 | ~₹26 |
| 194 | Tata Power Charging Station★ 5.0 (2) | 30 | CCS2 | ~₹18 |
| 198 | BPCL Charging Station★ 2.5 (2) | 60 | CCS2 | ~₹26 |
| 208 | BPCL eDrive Charging Station | 60 | CCS2 | ~₹26 |
| 208 | Magenta Charging Station★ 4.4 (12) | 60 | Ev Connector Type Unspecified Wall Outlet, Type 2, CCS2 | ~₹26 |
| 210 | Statiq Charging Station★ 1.8 (9) | 60 | CCS2 | ~₹22 |
| 210 | BPCL Charging Station★ 2.6 (5) | 30 | CCS2 | ~₹26 |
Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Pune → Hyderabad
Best EV for this corridor
Ranked by typical charging stops on ~560 km via NH65. Open a model page or plan with that preset in one tap.
Top pick
Hyundai Creta Electric
~390 km range · Typically 1 DC stop
The ~560 km drive is longer than one comfortable leg in a Hyundai Creta Electric. Most drivers plan one DC session on NH65, starting around 80–90% SOC.
More on this route: hotels · restaurants · all corridors
