Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~270 km · NH44 / NH34 · 5–6 typical drive
Chargers along this route
48 cached stations along ~270 km (fresh route). Sorted by distance from Nagpur.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 0 | Electric Vehicle Charging Station★ 3.3 (27) | 142 | CCS2 | ~₹26 |
| 9 | ChargeZone Charging Station★ 4.2 (6) | 60 | CCS2 | ~₹21 |
| 11 | Statiq Charging Station★ 2.3 (3) | 60 | CCS2 | ~₹22 |
| 16 | HPCL Charging Station★ 4.7 (3) | 30 | CCS2 | ~₹26 |
| 21 | HPeCharge Charging Station | 30 | CCS2 | ~₹26 |
| 21 | BPCL Charging Station★ 5.0 (3) | 30 | CCS2 | ~₹26 |
| 22 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 22 | HPeCharge Charging Station★ 4.0 (4) | 30 | CCS2 | ~₹26 |
| 22 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 27 | Servotech Charging Station★ 4.0 (7) | 30 | CCS2 | ~₹26 |
| 31 | BPCL Charging Station★ 5.0 (5) | 240 | CCS2 | ~₹26 |
| 32 | BPCL Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹26 |
| 33 | HPeCharge Charging Station★ 2.0 (1) | 30 | CCS2 | ~₹26 |
| 33 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 38 | BPCL Charging Station★ 3.6 (10) | 30 | CCS2 | ~₹26 |
| 68 | HPeCharge Charging Station★ 2.3 (3) | 30 | CCS2 | ~₹26 |
| 79 | Tata Power Charging Station★ 1.0 (1) | 7 | Type 2 | ~₹18 |
| 93 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 107 | BPCL Charging Station★ 3.7 (3) | 30 | CCS2 | ~₹26 |
| 107 | Statiq Charging Station★ 4.1 (16) | 120 | CCS2 | ~₹22 |
| 121 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 124 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 131 | Adani Charging Station★ 4.8 (6) | 30 | Ev Connector Type Unspecified Wall Outlet, CCS2 | ~₹26 |
| 135 | GOEC Charging Station★ 3.0 (4) | 25 | Ev Connector Type Unspecified Wall Outlet, CCS2 | ~₹26 |
| 140 | BPCL Charging Station★ 3.0 (4) | 30 | CCS2 | ~₹26 |
| 167 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 183 | Hindustan Petroleum Corporation Limited Charging Station | 30 | CCS2 | ~₹26 |
| 188 | BPCL Charging Station★ 1.0 (1) | 30 | CCS2 | ~₹26 |
| 188 | Adani Charging Station★ 3.5 (6) | 60 | CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 188 | Tata Power Charging Station | 30 | CCS2 | ~₹18 |
| 188 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 188 | ZeroFootPrint Charging Station★ 5.0 (1) | 22 | Ev Connector Type Unspecified Wall Outlet, Type 2 | ~₹26 |
| 188 | HP e-Charge Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹26 |
| 195 | HP e-Charge Charging Station★ 1.0 (1) | 30 | CCS2 | ~₹26 |
| 208 | HP e-Charge Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹26 |
| 215 | Bharat Petroleum Petrol Pump , ANIL HIGHWAY SERVICES★ 3.7 (90) | 60 | CCS2 | ~₹26 |
| 251 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 261 | chargeMOD Charging Station★ 3.0 (2) | 30 | CCS2 | ~₹26 |
| 262 | HP e-Charge Charging Station★ 5.0 (2) | 30 | CCS2 | ~₹26 |
| 263 | BPCL Charging Station★ 2.8 (4) | 60 | CCS2 | ~₹26 |
| 264 | Statiq Charging Station★ 3.3 (24) | 60 | CCS2 | ~₹22 |
| 269 | Electric Vehicle Charging Station★ 3.3 (29) | 20 | J1772 | ~₹26 |
| 269 | Adani Charging Station★ 1.0 (4) | 30 | Type 2, CCS2 | ~₹26 |
| 270 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 270 | Thunder Plus Charging Station★ 2.7 (3) | 25 | Type 2, CCS2 | ~₹26 |
| 270 | Adani Charging Station★ 3.2 (14) | 60 | CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 270 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 270 | EV Urjaa Charging Station★ 5.0 (1) | 10 | Ev Connector Type Other, Ev Connector Type Unspecified Wall Outlet, Type 2 | ~₹26 |
Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Nagpur → Jabalpur
Presets with the fewest charging stops
Ranked by estimated charging-stop count on ~270 km via NH44 / NH34, using each preset's configured range and consumption. This is not a recommendation based on price, safety, comfort, or overall vehicle quality.
Fewest estimated stops
Hyundai Creta Electric
~390 km range · Often no DC stop
At ~270 km, this leg is within a full charge for a Hyundai Creta Electric (~390 km ARAI) when you start at 90% SOC and keep a 20% reserve.
More on this route: hotels · restaurants · all corridors
