Lucknow → Varanasi

EV chargers on Lucknow → Varanasi

Plan Lucknow → Varanasi with ranked DC fast chargers along NH31. EV Grids picks primary and backup stops for your vehicle range — often no dc stop needed on this ~320 km leg.

Fast chargers on this corridor

  • Primary + backup charger at every stop — swap on the map if a site is busy or offline.
  • Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
  • Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.

~320 km · NH31 · 5–6 typical drive

Chargers along this route

48 cached stations along ~309.4 km (route cache). Sorted by distance from Lucknow.

Plan ranked stops
kmStationkWConnectors₹/kWh
0Statiq Charging Station4.0 (3)60CCS2~₹22
1E-Fill Electric Charging Station4.3 (6)30CCS2~₹26
2GLIDA Charging Station4.2 (5)60CCS2~₹24
3Adani Charging Station2.5 (11)240CCS2~₹26
3GLIDA Charging Station3.5 (4)30CCS2, Type 2~₹24
4Statiq Charging Station4.7 (24)60Ev Connector Type Other, Type 2, CCS2~₹22
5Glida Charging Station4.0 (23)200CCS2~₹24
9Goec Charging Station3.8 (12)60CCS2, Type 2, Ev Connector Type Other~₹26
15Adani Charging Station1.0 (7)60Ev Connector Type Unspecified Wall Outlet, CCS2~₹26
19Electric Vehicle Charging Station3.0 (2)60CCS2~₹26
26BPCL Charging Station60CCS2~₹26
26Adani Charging Station2.0 (4)60CCS2, Ev Connector Type Unspecified Wall Outlet~₹26
33Adani Charging Station1.4 (5)120Ev Connector Type Unspecified Wall Outlet, Type 2, CCS2~₹26
39BPCL Charging Station60CCS2~₹26
42BPCL Charging Station60CCS2~₹26
61ChargeZone Charging Station60CCS2~₹21
61Tata Power Charging Station3.0 (5)30CCS2~₹18
61Adani Charging Station3.0 (10)60CCS2, Ev Connector Type Unspecified Wall Outlet~₹26
80BPCL Charging Station3.0 (2)30CCS2~₹26
80Adani Charging Station3.5 (8)60CCS2, Ev Connector Type Unspecified Wall Outlet~₹26
117BPCL Charging Station60CCS2~₹26
122BPCL Charging Station30CCS2~₹26
124Statiq Charging Station3.8 (5)60CCS2~₹22
124Xobolt Charging Station4.5 (23)60CCS2~₹26
124Tata Power Charging Station60CCS2~₹18
124BPCL Charging Station5.0 (1)60CCS2~₹26
124BPCL Charging Station30CCS2~₹26
124ChargeZone Charging Station4.8 (4)60CCS2~₹21
124Adani Charging Station1.0 (1)60Ev Connector Type Other, CCS2~₹26
124Adani EV Charging Station3.7 (6)60Ev Connector Type Other, CCS2~₹26
124Tata Power Charging Station30CCS2~₹18
124Electric Vehicle Charging Station2.5 (8)220CCS2~₹26
124Adani Charging Station2.9 (9)60Ev Connector Type Other, CCS2~₹26
124BPCL Charging Station1.0 (1)30CCS2~₹26
124Adani Charging Station2.7 (9)60CCS2, Ev Connector Type Other~₹26
135Electric Vehicle Charging Station1.0 (1)60CCS2, Ev Connector Type Other~₹26
135Tata Power Charging Station3.0 (2)60CCS2~₹18
135Bajaj Auto Ltd Charging Station3Ev Connector Type Unspecified Wall Outlet~₹26
141BPCL Charging Station60CCS2~₹26
147BPCL Charging Station60CCS2~₹26
160Statiq Charging Station3.8 (10)60CCS2~₹22
160Tata Power Charging Station1.0 (3)30CCS2~₹18
161Electric Vehicle Charging Station3.5 (17)50CCS2~₹26
162Tata Power Charging Station3.0 (3)30CCS2~₹18
165Adani Charging Station4.7 (3)60CCS2, Ev Connector Type Unspecified Wall Outlet~₹26
212e-Charge Charging Station2.8 (9)30CCS2~₹26
213BPCL Charging Station4.2 (5)30CCS2~₹26
213Tata Power Charging Station3.3 (7)30CCS2~₹18

Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.

Want primary + backup picks at each stop? Plan LucknowVaranasi

Best EV for this corridor

Ranked by typical charging stops on ~320 km via NH31. Open a model page or plan with that preset in one tap.

Top pick

Tata Curvv EV (45 kWh)

~430 km range · Often no DC stop

Easiest

At ~320 km, this leg is within a full charge for a Tata Curvv EV (45 kWh) (~430 km ARAI) when you start at 90% SOC and keep a 20% reserve.

More on this route: hotels · restaurants · all corridors