Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~570 km · NH12 / NH27 · 9–10 typical drive
Chargers along this route
41 cached stations along ~576 km (route cache). Sorted by distance from Kolkata.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 44 | BPCL Charging Station★ 3.2 (9) | 30 | CCS2 | ~₹26 |
| 44 | Adani Charging Station★ 1.8 (5) | 60 | Ev Connector Type Unspecified Wall Outlet, CCS2 | ~₹26 |
| 44 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 84 | Adani Charging Station★ 2.8 (4) | 30 | CCS2, Ev Connector Type Other | ~₹26 |
| 102 | Tata Power Charging Station★ 4.1 (18) | 25 | CHAdeMO, CCS2 | ~₹18 |
| 102 | ChargeZone Charging Station★ 4.0 (1) | 60 | CCS2 | ~₹21 |
| 102 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 102 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 102 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 102 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 102 | HP e-Charge Charging Station | 60 | CCS2 | ~₹26 |
| 102 | BPCL Charging Station★ 5.0 (1) | 60 | CCS2 | ~₹26 |
| 102 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 123 | Tata Power Charging Station★ 4.1 (14) | 60 | CCS2 | ~₹18 |
| 137 | Tata Power Charging Station★ 4.6 (15) | 30 | CCS2 | ~₹18 |
| 138 | BPCL Charging Station★ 2.8 (4) | 60 | CCS2 | ~₹26 |
| 143 | ATGL Charging Station★ 3.4 (5) | 30 | CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 168 | BPCL Charging Station★ 1.0 (2) | 60 | CCS2 | ~₹26 |
| 199 | Tata Power Charging Station★ 3.0 (4) | 30 | CCS2 | ~₹18 |
| 213 | Tata Power Charging Station★ 4.4 (17) | 30 | CCS2 | ~₹18 |
| 234 | Adani Charging Station★ 2.4 (14) | 60 | Ev Connector Type Unspecified Wall Outlet, CCS2 | ~₹26 |
| 237 | BPCL Charging Station★ 4.7 (12) | 30 | CCS2 | ~₹26 |
| 259 | Tata Power Charging Station | 30 | CCS2 | ~₹18 |
| 305 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 323 | Tata Power Charging Station★ 2.6 (5) | 30 | CCS2 | ~₹18 |
| 333 | Tata Power Charging Station★ 1.0 (1) | 25 | CCS2 | ~₹18 |
| 336 | Tata Power Charging Station★ 3.0 (4) | 30 | CCS2, Type 2 | ~₹18 |
| 339 | Adani Charging Station★ 3.8 (6) | 60 | CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 342 | Adani Charging Station★ 3.4 (5) | 60 | Ev Connector Type Unspecified Wall Outlet, CCS2 | ~₹26 |
| 404 | Suzuki Motorcycle Charging Station | 9 | CHAdeMO, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 421 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 450 | BPCL Charging Station★ 5.0 (1) | 60 | CCS2 | ~₹26 |
| 451 | Tata Power Charging Station | 25 | CCS2 | ~₹18 |
| 459 | BPCL Charging Station★ 3.5 (6) | 60 | CCS2 | ~₹26 |
| 469 | HP e-Charge Charging Station★ 5.0 (3) | 30 | CCS2 | ~₹26 |
| 483 | Tata Power Charging Station | 30 | Type 2, CCS2 | ~₹18 |
| 486 | BPCL Charging Station★ 3.3 (3) | 60 | CCS2 | ~₹26 |
| 540 | HP e-Charge Charging Station | 30 | CCS2 | ~₹26 |
| 541 | Tata Power Charging Station | 25 | Type 2, CCS2 | ~₹18 |
| 541 | Tata Power Charging Station★ 1.0 (1) | 30 | CCS2 | ~₹18 |
| 545 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Kolkata → Siliguri
Presets with the fewest charging stops
Ranked by estimated charging-stop count on ~570 km via NH12 / NH27, using each preset's configured range and consumption. This is not a recommendation based on price, safety, comfort, or overall vehicle quality.
Fewest estimated stops
Hyundai Creta Electric
~390 km range · Typically 1 DC stop
The ~570 km drive is longer than one comfortable leg in a Hyundai Creta Electric. EV Grids estimates one DC session on NH12 / NH27 when you start around 80–90% SOC.
More on this route: hotels · restaurants · all corridors
