Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~570 km · NH19 · 9–10 typical drive
Chargers along this route
48 of 132 cached stations, spread across the route along ~575 km (route cache). Sorted by distance from Kolkata.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 8 | Electric Vehicle Charging Station★ 3.9 (34) | 50 | Type 2, CCS2 | ~₹26 |
| 46 | HPCL Charging Station★ 3.0 (2) | 60 | CCS2 | ~₹26 |
| 55 | Adani Charging Station★ 1.8 (5) | 60 | CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 83 | Tata Power Charging Station★ 4.0 (13) | 60 | CCS2 | ~₹18 |
| 83 | BPCL Charging Station★ 2.5 (2) | 60 | CCS2 | ~₹26 |
| 83 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 83 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 106 | Electric Vehicle Charging Station★ 4.0 (1) | 3 | Type 2 | ~₹26 |
| 113 | Tata Power Charging Station★ 3.0 (4) | 30 | CCS2 | ~₹18 |
| 122 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 150 | Adani Charging Station★ 2.5 (13) | 60 | CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 178 | Adani Charging Station★ 2.0 (4) | 60 | Ev Connector Type Unspecified Wall Outlet, CCS2 | ~₹26 |
| 179 | Adani Charging Station★ 3.8 (6) | 60 | CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 179 | Adani Charging Station★ 3.7 (3) | 60 | Ev Connector Type Unspecified Wall Outlet, CCS2 | ~₹26 |
| 187 | BPCL eDrive Charging Station★ 4.0 (1) | 60 | CCS2 | ~₹26 |
| 192 | Magenta Charging Station★ 4.2 (5) | 60 | CCS2 | ~₹26 |
| 192 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 192 | BPCL eDrive Charging Station | 60 | CCS2 | ~₹26 |
| 204 | BPCL eDrive Charging Station★ 5.0 (1) | 60 | CCS2 | ~₹26 |
| 223 | BPCL Charging Station★ 3.0 (2) | 60 | CCS2 | ~₹26 |
| 228 | Tata Power Charging Station | 30 | CCS2 | ~₹18 |
| 262 | BPCL Charging Station★ 5.0 (2) | 60 | CCS2 | ~₹26 |
| 278 | Tata Power Charging Station★ 3.9 (7) | 60 | CCS2, CHAdeMO | ~₹18 |
| 286 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 291 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 296 | BPCL Charging Station★ 3.7 (3) | 60 | CCS2 | ~₹26 |
| 325 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 330 | BPCL Charging Station★ 1.0 (1) | 60 | CCS2 | ~₹26 |
| 339 | BPCL Charging Station★ 2.0 (4) | 30 | CCS2 | ~₹26 |
| 350 | Statiq Charging Station★ 2.4 (7) | 60 | CCS2 | ~₹22 |
| 350 | Tata Power Charging Station★ 3.0 (4) | 60 | CCS2 | ~₹18 |
| 363 | Tata Power Charging Station★ 3.4 (5) | 60 | CCS2 | ~₹18 |
| 363 | Adani Charging Station★ 3.0 (2) | 60 | CCS2 | ~₹26 |
| 380 | Adani Charging Station★ 3.2 (12) | 60 | CCS2 | ~₹26 |
| 395 | BPCL Charging Station★ 2.5 (2) | 30 | CCS2 | ~₹26 |
| 407 | ChargeZone Charging Station★ 5.0 (1) | 60 | CCS2 | ~₹21 |
| 419 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 442 | E-Drive Charging Station★ 2.3 (6) | 30 | CCS2 | ~₹26 |
| 465 | Statiq Charging Station★ 4.5 (16) | 60 | CCS2, Type 2, Ev Connector Type Other | ~₹22 |
| 486 | BPCL Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹26 |
| 521 | Hindustan Petroleum Corporation Limited Charging Station | 30 | CCS2 | ~₹26 |
| 528 | Hindustan Petroleum Corporation Limited Charging Station | 30 | CCS2 | ~₹26 |
| 548 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 553 | BPCL Charging Station★ 1.0 (1) | 60 | CCS2 | ~₹26 |
| 575 | BPCL Charging Station★ 4.1 (8) | 60 | CCS2 | ~₹26 |
| 575 | BPCL Charging Station★ 4.3 (4) | 60 | CCS2 | ~₹26 |
| 575 | Mercedes-Benz Charging Station★ 5.0 (1) | 60 | CCS2 | ~₹26 |
| 575 | BPCL Charging Station★ 1.0 (1) | 60 | CCS2 | ~₹26 |
Showing 48 of 132 cached stations, spread along the whole route so both halves of the drive are represented. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Kolkata → Patna
Presets with the fewest charging stops
Ranked by estimated charging-stop count on ~570 km via NH19, using each preset's configured range and consumption. This is not a recommendation based on price, safety, comfort, or overall vehicle quality.
Fewest estimated stops
Hyundai Creta Electric
~390 km range · Typically 1 DC stop
The ~570 km drive is longer than one comfortable leg in a Hyundai Creta Electric. EV Grids estimates one DC session on NH19 when you start around 80–90% SOC.
More on this route: hotels · restaurants · all corridors
