Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~600 km · NH52 / NH60 · 10–11 typical drive
July — monsoon on Western Ghats routes
Monsoon rain on ghat roads means slower speeds and higher consumption. Pick backup chargers and avoid relying on a single gun near landslide-prone stretches.
- Enable hills & weather adjustment on EV Grids for climb/descent energy use.
- Charge to a higher % before the climb; regen on descents is helpful but not a full refill.
- Wet roads and slower traffic extend drive time — keep extra buffer SOC.
- Check highway advisories; have a backup charger picked on both sides of risky stretches.
Suggested planner settings: 30% reserve SOC · 35% search threshold · hills & weather on (includes monsoon adjustment Jun–Sep)
Chargers along this route
48 cached stations along ~668.4 km (route cache). Sorted by distance from Indore.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 0 | Adani Charging Station★ 3.2 (11) | 60 | Ev Connector Type Other, CCS2 | ~₹26 |
| 0 | Tata Power Charging Station★ 3.8 (11) | 25 | CHAdeMO, CCS2 | ~₹18 |
| 0 | BPCL Charging Station★ 4.5 (8) | 120 | CCS2 | ~₹26 |
| 9 | Statiq Charging Station★ 2.9 (16) | 60 | CCS2 | ~₹22 |
| 16 | E-Fill Electric Charging Station | 120 | CCS2 | ~₹26 |
| 22 | BPCL Charging Station★ 3.0 (2) | 60 | CCS2 | ~₹26 |
| 26 | HPCL Charging Station★ 5.0 (6) | 30 | CCS2 | ~₹26 |
| 29 | Tata Power Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹18 |
| 33 | BPCL Charging Station★ 1.0 (2) | 30 | CCS2 | ~₹26 |
| 63 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 79 | Statiq Charging Station★ 5.0 (1) | 180 | CCS2 | ~₹22 |
| 98 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 101 | Ecoplug Charging Station | 7 | Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 103 | Ecoplug Charging Station | 60 | Type 2, CCS2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 108 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 115 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 128 | BPCL Charging Station★ 3.3 (3) | 30 | CCS2 | ~₹26 |
| 137 | HPCL Charging Station★ 4.5 (13) | 30 | CCS2 | ~₹26 |
| 160 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 160 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 161 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 225 | Tata Power Charging Station | 30 | CCS2 | ~₹18 |
| 226 | Electric Vehicle Charging Station★ 5.0 (2) | 30 | CCS2 | ~₹26 |
| 229 | BPCL Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹26 |
| 229 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 229 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 229 | BPCL eDrive Charging Station | 30 | CCS2 | ~₹26 |
| 233 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 233 | BPCL Charging Station★ 5.0 (3) | 30 | CCS2 | ~₹26 |
| 234 | BPCL Charging Station★ 4.0 (3) | 30 | CCS2 | ~₹26 |
| 237 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 244 | BPCL Charging Station★ 5.0 (2) | 60 | CCS2 | ~₹26 |
| 254 | BPCL eDrive Charging Station | 30 | CCS2 | ~₹26 |
| 255 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 259 | Tata Power Charging Station★ 3.9 (8) | 30 | CCS2 | ~₹18 |
| 260 | Electric Vehicle Charging Station★ 3.2 (10) | 60 | CCS2 | ~₹26 |
| 260 | BPCL Charging Station★ 3.2 (5) | 30 | CCS2 | ~₹26 |
| 267 | BPCL Charging Station★ 2.0 (1) | 30 | CCS2 | ~₹26 |
| 269 | BPCL Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹26 |
| 270 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 273 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 273 | BPCL Charging Station★ 1.0 (3) | 30 | CCS2 | ~₹26 |
| 273 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 280 | BPCL Charging Station★ 1.0 (2) | 60 | CCS2 | ~₹26 |
| 280 | BPCL Charging Station★ 4.5 (2) | 60 | CCS2 | ~₹26 |
| 283 | BPCL Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹26 |
| 284 | HPCL Charging Station★ 4.1 (10) | 30 | CCS2 | ~₹26 |
| 284 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Indore → Pune
Best EV for this corridor
Ranked by typical charging stops on ~600 km via NH52 / NH60. Open a model page or plan with that preset in one tap.
Top pick
Hyundai Creta Electric
~390 km range · Typically 1 DC stop
The ~600 km drive is longer than one comfortable leg in a Hyundai Creta Electric. Most drivers plan one DC session on NH52 / NH60, starting around 80–90% SOC.
More on this route: hotels · restaurants · all corridors
