Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~640 km · NH65 / NH66 · 11–12 typical drive
Ghat route — plan with extra margin
This route includes significant climbs. Enable hills & weather adjustment and keep higher reserve SOC year-round.
- Enable hills & weather adjustment on EV Grids for climb/descent energy use.
- Charge to a higher % before the climb; regen on descents is helpful but not a full refill.
Suggested planner settings: 25% reserve SOC · 35% search threshold · hills & weather on (includes monsoon adjustment Jun–Sep)
Chargers along this route
Live charger list is temporarily unavailable. Use Plan trip to discover ranked stops along NH65 / NH66.
Plan with ranked chargersPresets with the fewest charging stops
Ranked by estimated charging-stop count on ~640 km via NH65 / NH66, using each preset's configured range and consumption. This is not a recommendation based on price, safety, comfort, or overall vehicle quality.
Fewest estimated stops
Tata Curvv EV (45 kWh)
~430 km range · Typically 1 DC stop
The ~640 km drive is longer than one comfortable leg in a Tata Curvv EV (45 kWh). EV Grids estimates one DC session on NH65 / NH66 when you start around 80–90% SOC.
More on this route: hotels · restaurants · all corridors
