Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~440 km · NH27 · 8–9 typical drive
July — monsoon & landslide risk on Northeast highways
Monsoon rain on NH27 and hill approaches raises landslide and washout risk. Range drops from humidity, slow convoys, and detours — enable hills & weather adjustment and plan backup stops.
- Wet roads and slower traffic extend drive time — keep extra buffer SOC.
- Check highway advisories; have a backup charger picked on both sides of risky stretches.
- Landslides and road closures can add hours — do not rely on a single charger in a narrow valley.
- Monitor IMD / state highway alerts; split long NE legs with an overnight hub (e.g. Siliguri).
Suggested planner settings: 32% reserve SOC · 38% search threshold · hills & weather on (includes monsoon adjustment Jun–Sep)
Chargers along this route
17 cached stations along ~430.6 km (route cache). Sorted by distance from Guwahati.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 158 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 167 | BPCL Charging Station★ 1.7 (3) | 30 | CCS2 | ~₹26 |
| 179 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 217 | eDrive Charging Station★ 5.0 (5) | 30 | CCS2 | ~₹26 |
| 225 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 229 | BPCL Charging Station★ 5.0 (1) | 30 | CCS2 | ~₹26 |
| 261 | E-Fill Electric Charging Station | 7 | Type 2 | ~₹26 |
| 263 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 288 | BPCL eDrive Charging Station | 60 | CCS2 | ~₹26 |
| 293 | Tata Power Charging Station★ 1.0 (2) | 30 | CCS2 | ~₹18 |
| 296 | BPCL Charging Station★ 2.0 (4) | 30 | CCS2 | ~₹26 |
| 297 | BPCL Charging Station★ 2.3 (3) | 30 | CCS2 | ~₹26 |
| 297 | Tata Power Charging Station | 25 | CCS2 | ~₹18 |
| 304 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 340 | Servotech Charging Station★ 4.5 (80) | 30 | CCS2 | ~₹26 |
| 354 | Tata Power Charging Station★ 4.0 (1) | 30 | CCS2, Type 2 | ~₹18 |
| 354 | BPCL Charging Station★ 3.0 (2) | 30 | CCS2 | ~₹26 |
Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Guwahati → Dibrugarh
Best EV for this corridor
Ranked by typical charging stops on ~440 km via NH27. Open a model page or plan with that preset in one tap.
Top pick
Mercedes-Benz EQS SUV
~600 km range · Often no DC stop
At ~440 km, this leg is within a full charge for a Mercedes-Benz EQS SUV (~600 km ARAI) when you start at 90% SOC and keep a 20% reserve.
More on this route: hotels · restaurants · all corridors
