Gurgaon → Jaipur

EV chargers on Gurgaon → Jaipur

Plan Gurgaon → Jaipur with ranked DC fast chargers along NH48. EV Grids picks primary and backup stops for your vehicle range — often no dc stop needed on this ~240 km leg.

Fast chargers on this corridor

  • Primary + backup charger at every stop — swap on the map if a site is busy or offline.
  • Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
  • Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.

~240 km · NH48 · 4–5 typical drive

May — pre-monsoon heat advisory

May and June heat across India often adds 10–15% energy use on highways (AC, battery cooling). Bump reserve SOC and search threshold for this route.

  • AC load and hot battery packs reduce real range — add 5% reserve SOC in May–June.
  • Plan DC stops earlier than winter; verify live charger status before you leave each city.

Suggested planner settings: 25% reserve SOC · 35% search threshold

Chargers along this route

48 cached stations along ~269.3 km (route cache). Sorted by distance from Gurgaon.

Plan ranked stops
kmStationkWConnectors₹/kWh
0ElectriVa Charging Station3.2 (5)25Ev Connector Type Unspecified Wall Outlet~₹26
0ElectricPe Charging Station5.0 (1)3Ev Connector Type Unspecified Wall Outlet~₹20
0Kurrent Charge Charging Station50CCS2, Type 2~₹26
0Kia Charging Station150CCS2~₹26
0Mercedes-Benz Charging Station2.3 (3)180CCS2~₹26
0Tata Power Charging Station5.0 (1)60CCS2~₹18
0Statiq Charging Station4.0 (4)60Ev Connector Type Unspecified Gb T, CCS2~₹22
0Statiq Charging Station5.0 (4)60CCS2~₹22
0ElectricPe Charging Station3.7 (3)3Ev Connector Type Unspecified Wall Outlet~₹20
1Electric Vehicle Charging Station3.4 (14)60CCS2~₹26
1Statiq Charging Station5.0 (1)60CCS2~₹22
1BPCL Charging Station30CCS2~₹26
1Statiq Charging Station4.5 (33)60CCS2~₹22
1Tata Power Charging Station5.0 (1)60CCS2~₹18
2KurrentCharge Charging Station60CCS2~₹26
2EVRE Charging Station2.0 (1)7Ev Connector Type Unspecified Wall Outlet, Type 2~₹26
2Nikol EV Charging Station5.0 (3)3Ev Connector Type Unspecified Wall Outlet~₹26
3Tata Power Charging Station5.0 (1)60CCS2, Ev Connector Type Unspecified Gb T, Ev Connector Type Other~₹18
4Tesla Supercharger5.0 (1)250Tesla~₹0.47
4Tata Power Charging Station60CCS2, Type 2, Ev Connector Type Unspecified Gb T~₹18
5Alektrify Charging Station4.6 (117)30Ev Connector Type Unspecified Wall Outlet, Ev Connector Type Other~₹26
81Tata Power Charging Station5.0 (2)240CCS2~₹18
86ChargeZone Charging Station5.0 (2)60CCS2~₹21
86ECOPLUG Charging Station4.6 (5)60CCS2~₹26
86Adani Charging Station1.0 (2)30CCS2~₹26
88Tata Power Charging Station1.7 (3)240CCS2~₹18
97HPCL Charging Station4.4 (5)30CCS2~₹26
119ChargeZone Charging Station4.3 (26)60CCS2~₹21
119BPCL Charging Station60CCS2~₹26
120ECOPLUG Charging Station2.3 (6)60CCS2~₹26
120ECOPLUG Charging Station5.0 (2)120CCS2~₹26
120Ecoplug Charging Station30Type 2, CCS2, Ev Connector Type Other~₹26
120ECOPLUG Charging Station4.2 (5)120CCS2~₹26
123Statiq Charging Station3.7 (3)30CCS2~₹22
123Xobolt Charging Station5.0 (1)120CCS2~₹26
123Tata Power Charging Station5.0 (1)30CCS2~₹18
124Xobolt Charging Station60CCS2~₹26
124Tata Power Charging Station60CCS2~₹18
124Adani Charging Station1.3 (3)10Type 2, Ev Connector Type Other~₹26
125ECOPLUG Charging Station1.0 (1)60CCS2~₹26
129BPCL Charging Station3.7 (3)60CCS2~₹26
144Volttic Charging Station3.8 (81)60CCS2~₹26
144Volttic Charging Station3.5 (36)60CCS2~₹26
178BPCL Charging Station1.5 (8)30CCS2~₹26
187BPCL Charging Station1.0 (1)30CCS2~₹26
187ECOPLUG Charging Station3.9 (8)60CCS2~₹26
202BPCL Charging Station5.0 (1)60CCS2~₹26
208ECOPLUG Charging Station3.3 (6)60CCS2~₹26

Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.

Want primary + backup picks at each stop? Plan GurgaonJaipur

Best EV for this corridor

Ranked by typical charging stops on ~240 km via NH48. Open a model page or plan with that preset in one tap.

Top pick

Citroën ë-C3

~320 km range · Often no DC stop

Easiest

At ~240 km, this leg is within a full charge for a Citroën ë-C3 (~320 km ARAI) when you start at 90% SOC and keep a 20% reserve.

More on this route: hotels · restaurants · all corridors