Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~280 km · NH109 · 7–8 typical drive
May — heat on ghat sections
Hot weather plus elevation changes eat range faster than brochure figures. Use the seasonal planner preset below for safer stop spacing.
- AC load and hot battery packs reduce real range — add 5% reserve SOC in May–June.
- Plan DC stops earlier than winter; verify live charger status before you leave each city.
- Enable hills & weather adjustment on EV Grids for climb/descent energy use.
- Charge to a higher % before the climb; regen on descents is helpful but not a full refill.
Suggested planner settings: 25% reserve SOC · 35% search threshold · hills & weather on (includes monsoon adjustment Jun–Sep)
Chargers along this route
No cached stations yet for ~275.9 km on NH109. Plan once to seed the corridor.
No cached chargers yet — plan this route once to seed the corridor cache.
No cached chargers yet — plan this route once to seed the corridor cache. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Dehradun → Nainital
Best EV for this corridor
Ranked by typical charging stops on ~280 km via NH109. Open a model page or plan with that preset in one tap.
Top pick
Hyundai Creta Electric
~390 km range · Often no DC stop
At ~280 km, this leg is within a full charge for a Hyundai Creta Electric (~390 km ARAI) when you start at 90% SOC and keep a 20% reserve.
More on this route: hotels · restaurants · all corridors