Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~280 km · NH109 · 7–8 typical drive
Ghat route — plan with extra margin
This route includes significant climbs. Enable hills & weather adjustment and keep higher reserve SOC year-round.
- Enable hills & weather adjustment on EV Grids for climb/descent energy use.
- Charge to a higher % before the climb; regen on descents is helpful but not a full refill.
- Wet roads and slower traffic extend drive time — keep extra buffer SOC.
- Check highway advisories; have a backup charger picked on both sides of risky stretches.
Suggested planner settings: 30% reserve SOC · 35% search threshold · hills & weather on (includes monsoon adjustment Jun–Sep)
Chargers along this route
38 cached stations along ~276 km (route cache). Sorted by distance from Dehradun.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 50 | Statiq Charging Station★ 2.9 (15) | 180 | CCS2 | ~₹22 |
| 50 | Statiq Charging Station★ 3.7 (3) | 30 | CCS2 | ~₹22 |
| 50 | BPCL Charging Station★ 4.0 (1) | 60 | CCS2 | ~₹26 |
| 50 | Tata Power Charging Station★ 3.3 (7) | 30 | CCS2, Type 2 | ~₹18 |
| 50 | BPCL Charging Station★ 1.0 (2) | 30 | CCS2 | ~₹26 |
| 50 | Tata Power Charging Station★ 5.0 (2) | 60 | CCS2 | ~₹18 |
| 50 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 56 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 59 | Tata Power Charging Station★ 1.0 (1) | 60 | CCS2 | ~₹18 |
| 61 | Hindustan Petroleum Corporation Limited Charging Station | 30 | CCS2 | ~₹26 |
| 61 | Hindustan Petroleum Corporation Limited Charging Station | 30 | CCS2 | ~₹26 |
| 61 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 70 | Hindustan Petroleum Corporation Limited Charging Station | 30 | CCS2 | ~₹26 |
| 74 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 74 | Electric Vehicle Charging Station★ 3.0 (11) | 30 | CCS2 | ~₹26 |
| 115 | Tata Power Charging Station★ 4.0 (17) | 25 | CHAdeMO, CCS2 | ~₹18 |
| 180 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 188 | Gentari Charging Station | 60 | CCS2 | ~₹26 |
| 192 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 193 | ChargeZone Charging Station★ 3.3 (3) | 60 | CCS2 | ~₹21 |
| 195 | Hindustan Petroleum Corporation Limited Charging Station | 30 | CCS2 | ~₹26 |
| 198 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 198 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 198 | Hindustan Petroleum Corporation Limited Charging Station | 30 | CCS2 | ~₹26 |
| 198 | BPCL Charging Station★ 1.0 (1) | 30 | CCS2 | ~₹26 |
| 200 | BPCL Charging Station★ 4.0 (2) | 30 | CCS2 | ~₹26 |
| 204 | BPCL Charging Station★ 5.0 (3) | 30 | CCS2 | ~₹26 |
| 207 | Kazam Charging Station | 3 | Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 220 | BPCL eDrive Charging Station | 60 | CCS2 | ~₹26 |
| 222 | Tata Power Charging Station★ 3.0 (2) | 60 | CCS2 | ~₹18 |
| 235 | BMW Destination Charging Station★ 1.0 (1) | 22 | Type 2 | ~₹26 |
| 250 | BPCL Charging Station★ 3.0 (4) | 30 | CCS2 | ~₹26 |
| 259 | ChargeZone Charging Station★ 3.5 (10) | 60 | CCS2 | ~₹21 |
| 259 | BPCL Charging Station★ 3.5 (2) | 30 | CCS2 | ~₹26 |
| 261 | BMW Charging Station★ 5.0 (1) | 60 | Type 2, CCS2 | ~₹26 |
| 269 | Statiq Charging Station★ 3.3 (3) | 60 | CCS2 | ~₹22 |
| 274 | E-Fill Charging Station★ 3.1 (11) | 7 | Type 2 | ~₹26 |
| 275 | Tata Power Charging Station★ 5.0 (2) | 30 | Type 2, CCS2 | ~₹18 |
Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Dehradun → Nainital
Presets with the fewest charging stops
Ranked by estimated charging-stop count on ~280 km via NH109, using each preset's configured range and consumption. This is not a recommendation based on price, safety, comfort, or overall vehicle quality.
Fewest estimated stops
Hyundai Creta Electric
~390 km range · Often no DC stop
At ~280 km, this leg is within a full charge for a Hyundai Creta Electric (~390 km ARAI) when you start at 90% SOC and keep a 20% reserve.
More on this route: hotels · restaurants · all corridors
