Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~215 km · NH81 · 4–5 typical drive
May — pre-monsoon heat advisory
May and June heat across India often adds 10–15% energy use on highways (AC, battery cooling). Bump reserve SOC and search threshold for this route.
- AC load and hot battery packs reduce real range — add 5% reserve SOC in May–June.
- Plan DC stops earlier than winter; verify live charger status before you leave each city.
Suggested planner settings: 25% reserve SOC · 35% search threshold
Chargers along this route
40 cached stations along ~220.4 km (route cache). Sorted by distance from Coimbatore.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 1 | VEEV Charging Station★ 4.1 (36) | 7 | Type 2 | ~₹26 |
| 1 | Zeon Charging Station★ 4.6 (63) | 120 | CCS2, Type 2 | ~₹20 |
| 1 | Zeon Charging Station★ 4.4 (13) | 7 | Type 2 | ~₹20 |
| 1 | ChargeZone Charging Station★ 4.4 (17) | 50 | CCS2 | ~₹21 |
| 1 | ChargeZone Charging Station★ 3.2 (15) | 60 | CCS2 | ~₹21 |
| 1 | Tata Power Charging Station★ 3.0 (11) | 30 | Type 2, CCS2 | ~₹18 |
| 2 | Statiq Charging Station★ 4.9 (7) | 60 | Ev Connector Type Other, CCS2 | ~₹22 |
| 2 | Hydra Charging Station★ 4.6 (31) | 120 | CCS2 | ~₹26 |
| 6 | Zeon Charging Station★ 4.7 (13) | 24 | CCS2 | ~₹20 |
| 6 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 6 | Tata Power Charging Station★ 5.0 (2) | 30 | Type 2, CCS2 | ~₹18 |
| 11 | Zeon Charging Station★ 4.6 (142) | 120 | Ev Connector Type Unspecified Wall Outlet, CCS2 | ~₹20 |
| 11 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 11 | BPCL Charging Station★ 1.0 (2) | 30 | CCS2 | ~₹26 |
| 11 | Mercedes-Benz Charging Station★ 4.2 (5) | 180 | CCS2 | ~₹26 |
| 130 | Electric Vehicle Charging Station★ 3.2 (5) | 30 | CCS2 | ~₹26 |
| 130 | Hydra Charging Station★ 4.6 (16) | 120 | CCS2 | ~₹26 |
| 130 | Electric Vehicle Charging Station★ 1.0 (1) | 2 | Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 152 | BPCL Charging Station★ 1.0 (1) | 60 | CCS2 | ~₹26 |
| 156 | Zeon Charging Station★ 4.7 (39) | 120 | CCS2 | ~₹20 |
| 156 | Zeon Charging Station★ 4.6 (25) | 120 | CCS2 | ~₹20 |
| 156 | VIA Charging Station★ 4.4 (8) | 25 | Type 2, CCS2 | ~₹26 |
| 160 | Zeon Charging Station★ 4.4 (25) | 120 | CCS2 | ~₹20 |
| 161 | Tata Power Charging Station | 60 | CCS2 | ~₹18 |
| 165 | BPCL Charging Station★ 4.5 (8) | 60 | CCS2 | ~₹26 |
| 189 | BPCL Charging Station★ 3.0 (2) | 30 | CCS2 | ~₹26 |
| 193 | Zeon Charging Station★ 4.2 (126) | 60 | CCS2 | ~₹20 |
| 200 | BPCL Charging Station★ 3.0 (4) | 30 | CCS2 | ~₹26 |
| 203 | Tata Power Charging Station★ 5.0 (1) | 150 | CCS2 | ~₹18 |
| 211 | Tata Power Charging Station★ 1.0 (1) | 30 | CCS2 | ~₹18 |
| 218 | Tata Power Charging Station★ 3.0 (2) | 30 | CCS2 | ~₹18 |
| 218 | Tata Power Charging Station★ 1.0 (2) | 30 | CCS2 | ~₹18 |
| 218 | Adani Charging Station★ 3.0 (2) | 60 | CCS2 | ~₹26 |
| 218 | Zeon Charging Station★ 4.5 (2) | 24 | CCS2 | ~₹20 |
| 220 | Zeon Charging Station★ 4.6 (29) | 50 | CCS2 | ~₹20 |
| 220 | Tucker Charging Station★ 2.4 (5) | 22 | Type 2, Ev Connector Type Unspecified Wall Outlet | ~₹26 |
| 220 | Zeon Charging Station★ 5.0 (3) | 60 | CCS2, Type 2 | ~₹20 |
| 220 | Tata Power Charging Station★ 1.0 (1) | 30 | CCS2 | ~₹18 |
| 220 | Zeon Charging Station★ 4.8 (8) | 120 | CCS2 | ~₹20 |
| 220 | Zeon Charging Station★ 4.7 (16) | 120 | CCS2 | ~₹20 |
Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Coimbatore → Madurai
Best EV for this corridor
Ranked by typical charging stops on ~215 km via NH81. Open a model page or plan with that preset in one tap.
Top pick
Tata Punch EV
~315 km range · Often no DC stop
At ~215 km, this leg is within a full charge for a Tata Punch EV (~315 km ARAI) when you start at 90% SOC and keep a 20% reserve.
More on this route: hotels · restaurants · all corridors