Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~195 km · NH52 · 3–4 typical drive
Chargers along this route
23 cached stations along ~193 km (route cache). Sorted by distance from Bhopal.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 1 | Statiq Charging Station★ 4.0 (10) | 60 | CCS2 | ~₹22 |
| 1 | Adani Charging Station | 30 | CCS2 | ~₹26 |
| 3 | Statiq Charging Station★ 3.6 (13) | 60 | Type 2, CCS2 | ~₹22 |
| 7 | HPeCharge Charging Station★ 4.0 (5) | 30 | CCS2 | ~₹26 |
| 21 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 24 | Tata Power Charging Station★ 2.5 (6) | 60 | CCS2 | ~₹18 |
| 42 | Adani Charging Station★ 2.6 (5) | 60 | Ev Connector Type Unspecified Wall Outlet, CCS2 | ~₹26 |
| 51 | BPCL Charging Station★ 4.4 (5) | 30 | CCS2 | ~₹26 |
| 99 | EV COSMOS Charging Station★ 4.5 (33) | 60 | CCS2 | ~₹26 |
| 129 | Charge Grid Charging Station★ 3.5 (4) | 7 | Type 2 | ~₹26 |
| 129 | Hindustan Petroleum Corporation Limited Charging Station | 30 | CCS2 | ~₹26 |
| 139 | HPeCharge Charging Station★ 3.7 (3) | 30 | CCS2 | ~₹26 |
| 139 | ChargeZone x VinFast EV Charging Station★ 4.0 (8) | 60 | CCS2 | ~₹21 |
| 149 | Ecoplug Charging Station★ 5.0 (1) | 60 | CCS2 | ~₹26 |
| 159 | HPeCharge Charging Station★ 5.0 (4) | 30 | CCS2 | ~₹26 |
| 159 | ChargeZone Charging Station★ 4.0 (3) | 60 | CCS2 | ~₹21 |
| 164 | HPeCharge Charging Station★ 3.2 (13) | 30 | CCS2 | ~₹26 |
| 179 | ChargeZone Charging Station★ 3.2 (9) | 60 | CCS2 | ~₹21 |
| 189 | BPCL Charging Station★ 4.5 (8) | 120 | CCS2 | ~₹26 |
| 189 | Adani Charging Station★ 3.1 (12) | 60 | CCS2, Ev Connector Type Other | ~₹26 |
| 191 | Tata Power Charging Station★ 3.8 (11) | 25 | CCS2, CHAdeMO | ~₹18 |
| 193 | Statiq Charging Station★ 2.9 (16) | 60 | CCS2 | ~₹22 |
| 193 | ChargeZone Charging Station★ 3.0 (1) | 60 | CCS2 | ~₹21 |
Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Bhopal → Indore
Presets with the fewest charging stops
Ranked by estimated charging-stop count on ~195 km via NH52, using each preset's configured range and consumption. This is not a recommendation based on price, safety, comfort, or overall vehicle quality.
Fewest estimated stops
Tata Nexon EV
~280 km range · Often no DC stop
At ~195 km, this leg is within a full charge for a Tata Nexon EV (~280 km ARAI) when you start at 90% SOC and keep a 20% reserve.
More on this route: hotels · restaurants · all corridors
