EV chargers on Bangalore → Mysore

Plan Bangalore → Mysore with ranked DC fast chargers along NH275. EV Grids picks primary and backup stops for your vehicle range — often no dc stop needed on this ~145 km leg.

Fast chargers on this corridor

  • Primary + backup charger at every stop — swap on the map if a site is busy or offline.
  • Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
  • Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.

~145 km · NH275 · 3 typical drive

Chargers along this route

22 cached stations along ~140 km (route cache). Sorted by distance from Bangalore.

Plan ranked stops
kmStationkWConnectors₹/kWh
0Shell Recharge Charging Station★ 4.2 (19)120CCS2~₹24
0ChargeZone Charging Station★ 3.5 (11)60CCS2~₹21
0ChargeZone Charging Station★ 4.4 (17)60CCS2~₹21
0Statiq Charging Station★ 3.1 (16)60CCS2~₹22
4Shell Recharge Charging Station★ 3.4 (12)120CCS2~₹24
9Zeon Charging Station★ 4.0 (53)120Ev Connector Type Unspecified Wall Outlet, CCS2~₹20
9BPCL Charging Station★ 5.0 (1)60CCS2~₹26
47ChargeZone Charging Station★ 3.2 (20)60CCS2~₹21
50Statiq Charging Station★ 3.4 (11)120CCS2~₹22
50GOEC Charging Station★ 5.0 (4)120CCS2~₹26
50HP e-Charge Charging Station30CCS2~₹26
70Zeon Charging Station★ 4.5 (71)200CCS2, Ev Connector Type Unspecified Wall Outlet~₹20
70Zeon Charging Station★ 4.7 (45)60CCS2~₹20
70Zeon Charging Station★ 3.5 (22)180CCS2~₹20
70Statiq Charging Station★ 4.0 (6)60CCS2~₹22
97ChargeZone Charging Station★ 4.7 (13)150CCS2~₹21
97GLIDA Charging Station★ 2.8 (6)60CCS2~₹24
97Kazam Charging Station3Ev Connector Type Unspecified Wall Outlet~₹26
97Hyundai EV Charging Station★ 3.8 (6)150CCS2~₹26
97Statiq Charging Station★ 4.0 (21)30CCS2~₹22
98BPCL Charging Station60CCS2~₹26
98Kazam Charging Station3Ev Connector Type Unspecified Wall Outlet~₹26

Stations from EV Grids cache along the driving route. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.

Want primary + backup picks at each stop? Plan Bangalore → Mysore

Presets with the fewest charging stops

Ranked by estimated charging-stop count on ~145 km via NH275, using each preset's configured range and consumption. This is not a recommendation based on price, safety, comfort, or overall vehicle quality.

Fewest estimated stops

MG Comet EV

~230 km range · Often no DC stop

Easiest

At ~145 km, this leg is within a full charge for a MG Comet EV (~230 km ARAI) when you start at 90% SOC and keep a 20% reserve.

More on this route: hotels · restaurants · all corridors