Fast chargers on this corridor
- Primary + backup charger at every stop — swap on the map if a site is busy or offline.
- Filter by CCS2, Type 2, NACS, or minimum kW for your EV.
- Prefer lower-cost ranks Tata Power, Statiq, ChargeZone, and plaza operators where data exists.
~560 km · NH48 / NH66 · 9–10 typical drive
September — monsoon on Western Ghats routes
Monsoon rain on ghat roads means slower speeds and higher consumption. Pick backup chargers and avoid relying on a single gun near landslide-prone stretches.
- Enable hills & weather adjustment on EV Grids for climb/descent energy use.
- Charge to a higher % before the climb; regen on descents is helpful but not a full refill.
- Wet roads and slower traffic extend drive time — keep extra buffer SOC.
- Check highway advisories; have a backup charger picked on both sides of risky stretches.
Suggested planner settings: 30% reserve SOC · 35% search threshold · hills & weather on (includes monsoon adjustment Jun–Sep)
Chargers along this route
48 of 137 cached stations, spread across the route along ~545 km (route cache). Sorted by distance from Bangalore.
| km | Station | kW | Connectors | ₹/kWh |
|---|---|---|---|---|
| 1 | Statiq Charging Station★ 4.4 (32) | 60 | CCS2 | ~₹22 |
| 1 | Shell Recharge Charging Station★ 4.1 (12) | 120 | CCS2 | ~₹24 |
| 8 | BluSmart Charging Station★ 4.3 (134) | 60 | CCS2 | ~₹26 |
| 8 | Glida★ 4.3 (23) | 60 | CCS2, Type 2, Ev Connector Type Unspecified Gb T | ~₹24 |
| 43 | BPCL Charging Station★ 4.3 (8) | 30 | CCS2 | ~₹26 |
| 64 | BESCOM Charging Station★ 2.8 (11) | 25 | Ev Connector Type Unspecified Gb T, CCS2, Ev Connector Type Other | ~₹26 |
| 70 | Kia Charging Station | 90 | CCS2 | ~₹26 |
| 73 | Tata Power Charging Station★ 2.8 (20) | 60 | CCS2 | ~₹18 |
| 85 | Hindustan Petroleum Corporation Limited Charging Station | 60 | CCS2 | ~₹26 |
| 104 | Tata Power Charging Station★ 2.0 (5) | 30 | CCS2 | ~₹18 |
| 115 | ChargeIn Charging Station★ 3.8 (12) | 180 | CCS2 | ~₹26 |
| 115 | GLIDA Charging Station★ 2.4 (16) | 60 | CCS2 | ~₹24 |
| 121 | ChargeZone Charging Station★ 4.6 (141) | 180 | CCS2 | ~₹21 |
| 121 | VOLTRAN Charging Station★ 4.9 (401) | 120 | CCS2 | ~₹26 |
| 140 | Statiq Charging Station★ 4.1 (14) | 90 | CCS2 | ~₹22 |
| 140 | ChargeZone Charging Station★ 4.4 (20) | 60 | CCS2 | ~₹21 |
| 156 | BPCL Charging Station★ 5.0 (3) | 30 | CCS2 | ~₹26 |
| 165 | BPCL Charging Station | 30 | CCS2 | ~₹26 |
| 176 | Tata Power Charging Station★ 4.0 (11) | 60 | CCS2 | ~₹18 |
| 188 | Zeon Charging Station★ 4.3 (72) | 120 | CCS2 | ~₹20 |
| 195 | Hyundai Charging Station★ 4.5 (15) | 150 | CCS2 | ~₹26 |
| 201 | Statiq Charging Station★ 4.4 (19) | 60 | CCS2 | ~₹22 |
| 209 | eDRIVE Charging Station★ 4.1 (151) | 30 | CCS2 | ~₹26 |
| 230 | Zeon Charging Station★ 3.0 (2) | 120 | CCS2 | ~₹20 |
| 240 | BPCL Charging Station★ 2.8 (4) | 30 | CCS2 | ~₹26 |
| 254 | Hindustan Petroleum Corporation Limited Charging Station | 30 | CCS2 | ~₹26 |
| 263 | ChargeZone★ 4.5 (21) | 120 | CCS2 | ~₹21 |
| 263 | ChargeZone x TATA.ev MegaCharger★ 3.5 (11) | 120 | CCS2, Type 2 | ~₹21 |
| 282 | Tata Power Charging Station★ 3.2 (5) | 60 | CCS2 | ~₹18 |
| 285 | BPCL Charging Station★ 1.8 (4) | 30 | CCS2 | ~₹26 |
| 299 | BPCL Charging Station★ 3.3 (9) | 30 | CCS2 | ~₹26 |
| 316 | BPCL Charging Station★ 3.4 (5) | 60 | CCS2 | ~₹26 |
| 318 | Zeon Charging Station★ 4.9 (13) | 120 | CCS2 | ~₹20 |
| 324 | Tata Power Charging Station★ 3.5 (16) | 60 | CCS2 | ~₹18 |
| 331 | Electric Vehicle Charging Station★ 4.5 (10) | 30 | CCS2 | ~₹26 |
| 350 | BPCL Charging Station★ 1.0 (1) | 30 | CCS2 | ~₹26 |
| 355 | ChargeZone Charging Station★ 3.9 (19) | 60 | CCS2 | ~₹21 |
| 355 | ChargeZone x TATA.ev MegaCharger★ 4.0 (28) | 120 | CCS2 | ~₹21 |
| 373 | Tata Power Charging Station★ 4.5 (6) | 30 | CCS2 | ~₹18 |
| 383 | Zeon Charging Station★ 4.8 (59) | 90 | CCS2 | ~₹20 |
| 396 | Hyundai Charging Station★ 4.7 (19) | 150 | CCS2 | ~₹26 |
| 404 | Tata Power Charging Station | 25 | CCS2, CHAdeMO | ~₹18 |
| 417 | ChargeZone x TATA.ev MegaCharger★ 4.2 (12) | 120 | Type 2, CCS2 | ~₹21 |
| 427 | ChargeZone Charging Station★ 3.8 (5) | 60 | CCS2 | ~₹21 |
| 436 | Charge_iN by Mahindra Charging Station★ 3.5 (10) | 180 | CCS2 | ~₹26 |
| 519 | BPCL Charging Station | 60 | CCS2 | ~₹26 |
| 531 | Bharat Petroleum Charging Station | 60 | CCS2 | ~₹26 |
| 545 | BPCL Charging Station★ 5.0 (1) | 60 | CCS2 | ~₹26 |
Showing 48 of 137 cached stations, spread along the whole route so both halves of the drive are represented. Plan a trip for ranked primary/backup picks at each stop. List updates as drivers plan this corridor — not live occupancy.
Want primary + backup picks at each stop? Plan Bangalore → Goa
Presets with the fewest charging stops
Ranked by estimated charging-stop count on ~560 km via NH48 / NH66, using each preset's configured range and consumption. This is not a recommendation based on price, safety, comfort, or overall vehicle quality.
Fewest estimated stops
Hyundai Creta Electric
~390 km range · Typically 1 DC stop
The ~560 km drive is longer than one comfortable leg in a Hyundai Creta Electric. EV Grids estimates one DC session on NH48 / NH66 when you start around 80–90% SOC.
More on this route: hotels · restaurants · all corridors
