Jodhpur to Udaipur EV Charging & Trip Planner

RajasthanBlue City to Lake City — popular tourism loop leg.
~260 kmNH62 / NH274–5 typical drive

Plan now uses a vehicle preset, 90% start SOC, Wh/km from preset, and cost-aware ranking on longer corridors. Adjust on the planner page if needed.

Planning effort

Straightforward
  • 260 km is within one or two sessions

This rates how much planning the route needs, not road quality. Charger spacing comes from stations recorded in the EV Grids cache and changes as coverage grows.

Presets with the fewest charging stops

Ranked by estimated charging-stop count on ~260 km via NH62 / NH27, using each preset's configured range and consumption. This is not a recommendation based on price, safety, comfort, or overall vehicle quality.

Fewest estimated stops

Citroën ë-C3 Aircross

~350 km range · Often no DC stop

Easiest

At ~260 km, this leg is within a full charge for a Citroën ë-C3 Aircross (~350 km ARAI) when you start at 90% SOC and keep a 20% reserve.

Plan this route

Jump to chargers, overnight hotels, meal stops, or pick your EV model — each page links back here and opens the trip planner pre-filled for Jodhpur Udaipur.

Plan by vehicle

All vehicle guides →

Can your EV make this trip?

Popular searches for JodhpurUdaipur — each page answers yes/no, typical charging stops, and opens the planner.

Browse all “Can my EV go…?” guides →

Highways, states & charging networks

Long-tail guides for NH62 / NH27 — operators, state hubs, and NH-specific EV charging notes linked to this route.

Highway guides

Sample plan narrative

Leave Jodhpur at 88–92% SOC with your real vehicle preset selected (not a random long-range SUV). For ~260 km on NH62 / NH27, EV Grids will place DC searches when estimated SOC crosses your threshold. Pali / Sadri belt if you need a top-up. Udaipur old city: charge before narrow lanes. Charge to what the next leg needs — often 80–90% — then open Google Maps with your chosen primary and backup as waypoints toward Udaipur.

Illustrative only — open Plan now above for ranked stops with your vehicle preset and live charger data.

Driving Jodhpur to Udaipur

Jodhpur to Udaipur covers about 260 km in 4–5 hours on NH62 / NH27 (Rajasthan). Blue City to Lake City — popular tourism loop leg. Real consumption still depends on speed, AC, payload, and elevation — enter Wh/km from recent drives instead of brochure range.

NH27 toward the Northeast has genuine sparse stretches. Split long days; Siliguri-style hubs matter more than brochure range.

Charging strategy on this corridor

At ~260 km, a 350 km+ ARAI car starting at 90% with 20% reserve often makes Udaipur with zero or one DC session. 250–320 km class cars should plan one stop and a backup. Do not copy a long-range SUV itinerary into a Tiago EV.

Local notes drivers actually use: Pali / Sadri belt if you need a top-up. Udaipur old city: charge before narrow lanes.

Weather, hills, and Rajasthan conditions

Desert heat after Jaipur is a SOC killer at 2 p.m. Plan indoor charging in the afternoon when you can.

How to plan this trip on EV Grids

Open Plan now to pre-fill Jodhpur and Udaipur. Pick your vehicle, set start SOC honestly, and keep search threshold above reserve. Prefer lower-cost if you have memberships; Fastest if you only want high-kW DC.

Stop count for Jodhpur to Udaipur

This is an EV Grids calculation, not an observation: 260 km at roughly 165 Wh/km needs on the order of 43 kWh of road energy, and the planner keeps a 20% reserve in hand.

A compact (about 40 kWh usable) pack reaches about 195 km before reserve, which puts this leg at about 1 DC session. A mid-size (about 50 kWh usable) pack reaches about 240 km before reserve, which puts this leg at about 1 DC session. A long-range (about 70 kWh usable) pack reaches about 340 km before reserve, so it can usually complete this leg without charging.

Think of 260 km as two halves of roughly 130 km. If you need one stop, it belongs near the midpoint rather than close to either city.

Drive faster, run the air conditioning harder, or load the car and every number above moves the wrong way. Enter your own Wh/km on the planner and it will re-space the stops for NH62 / NH27 accordingly.

Operators and practical stops between Jodhpur and Udaipur

On NH62 / NH27 you will typically see a mix of Tata Power, Jio-BP Pulse, Statiq, ChargeZone, plaza DISCOM guns, and the occasional mall DC. EV Grids ranks by detour and reliability, not brand loyalty. Memberships change ₹/kWh; they do not reserve a stall.

If a charger fails on this route

Do not wait indefinitely at a dark site between Jodhpur and Udaipur. Use the backup you already selected; if a swap breaks a later leg, use Fix trip. Keep operator apps logged in. Hotel or mall Type 2 is a valid recovery if you have hours — better than a tow.

Report a permanently closed or moved pin via EV Grids feedback with this corridor slug (jodhpur-to-udaipur) so badges and ranking can be updated.

Quick tips

  • Pali / Sadri belt if you need a top-up.
  • Udaipur old city: charge before narrow lanes.

Frequently asked questions

What is the main highway for Jodhpur to Udaipur?
NH62 / NH27. Stay with chargers on that driving path in EV Grids rather than city-centre detours.
Is Jodhpur to Udaipur a good first EV highway trip?
If Jodhpur → Udaipur is your first long EV day, leave earlier than a petrol habit, eat at the charger, and do not skip the backup pin ‘because it is only 350 km’.
Does EV Grids guarantee chargers on Jodhpur to Udaipur?
No. Pins and kW come from maps listings plus ranking. Always keep a backup and verify live status where the network publishes it.
Should I set Wh/km on EV Grids for this route?
Yes, if you know your car's average consumption. Vehicle presets pre-fill Wh/km (e.g. Nexon EV Max ~155 Wh/km). Highway driving with AC in Indian heat often uses more than the brochure figure — enter your own Wh/km for tighter SOC estimates and safer stop spacing.
How do lower-cost and max ₹/kWh filters work?
Enable Prefer lower-cost stations to rank Tata Power, Statiq, ChargeZone, and other networks by indicative ₹/kWh. Optionally set a max ₹/kWh cap to skip pricier sites when the operator is known. EV Grids still checks you can reach each stop with your reserve SOC — if a cheap station is too far, we suggest a reachable alternative.

More routes

Browse all EV corridor guides →