What to expect
Roughly 440 km (7–8 hours) along NH16. Coastal humidity increases AC use.
1–2 DC stops depending on pack and speed.
East India
Odisha to Andhra coastal highway — improving NH16 coverage.
Plan now uses a vehicle preset, 90% start SOC, Wh/km from preset, and cost-aware ranking on longer corridors. Adjust on the planner page if needed.
May and June heat across India often adds 10–15% energy use on highways (AC, battery cooling). Bump reserve SOC and search threshold for this route.
Suggested planner settings: 25% reserve SOC · 35% search threshold
Roughly 440 km (7–8 hours) along NH16. Coastal humidity increases AC use.
1–2 DC stops depending on pack and speed.
Link to Hyderabad corridors via Vizag as hub.
Weather adjustment useful in summer.